Project Lifecycle · Phase 5 of 6
Testing & Commissioning
Systematic, documented energisation — from first power-on to full operational sign-off.
What we do here
Our scope in this phase
- Pre-commissioning and loop checking
- Protection relay testing and setting verification
- Power system energisation and functional testing
- SCADA and automation system Site Acceptance Testing (SAT)
- Interoperability and integration testing across multi-vendor systems
- Commissioning documentation: test records, punch list close-out, as-commissioned data sheets
- Operational readiness review and handover to client operations
Why it matters
The impact of getting this right
Commissioning is where a project becomes a system — and where every shortcut taken upstream becomes visible. APARA's commissioning engineers are the same people who wrote the design: we know what the system is supposed to do, and we test until we can prove it does. Structured testing, clear documentation and formal sign-off protect both the asset and the people operating it.
Typical activities
What this phase looks like day-to-day
Loop check
Verify every instrument loop end-to-end against loop drawings.
Relay test
Test and verify protection relay settings per coordination study.
Functional test
Execute functional tests against FDS acceptance criteria.
Energisation
Managed first energisation of MV/LV systems with safety oversight.
SAT execution
Site acceptance testing for SCADA, PLC and DCS systems.
Integration test
Verify signal exchange and interoperability across systems.
Punch list close-out
Resolve all outstanding items before handover.
Handover documentation
Complete as-commissioned records and final sign-off.