Back to Services

Project Lifecycle · Phase 5 of 6

Testing & Commissioning

Systematic, documented energisation — from first power-on to full operational sign-off.

What we do here

Our scope in this phase

  • Pre-commissioning and loop checking
  • Protection relay testing and setting verification
  • Power system energisation and functional testing
  • SCADA and automation system Site Acceptance Testing (SAT)
  • Interoperability and integration testing across multi-vendor systems
  • Commissioning documentation: test records, punch list close-out, as-commissioned data sheets
  • Operational readiness review and handover to client operations

Why it matters

The impact of getting this right

Commissioning is where a project becomes a system — and where every shortcut taken upstream becomes visible. APARA's commissioning engineers are the same people who wrote the design: we know what the system is supposed to do, and we test until we can prove it does. Structured testing, clear documentation and formal sign-off protect both the asset and the people operating it.

Typical activities

What this phase looks like day-to-day

Loop check

Verify every instrument loop end-to-end against loop drawings.

Relay test

Test and verify protection relay settings per coordination study.

Functional test

Execute functional tests against FDS acceptance criteria.

Energisation

Managed first energisation of MV/LV systems with safety oversight.

SAT execution

Site acceptance testing for SCADA, PLC and DCS systems.

Integration test

Verify signal exchange and interoperability across systems.

Punch list close-out

Resolve all outstanding items before handover.

Handover documentation

Complete as-commissioned records and final sign-off.

Related expertise

The disciplines we bring to this phase

Get in touch